High Quality Track Link Track Shoe Assembly, R60 R55 R200 R210 R210LC R250 R300 R320 Track Link Assy
Contact Supplier
Product Attributes
- Customization
- Available
- Type
- Crawler Excavator
- Usage
- Mining Excavator
- Bucket
- Backhoe
- Transmission
- General
- Drive Type
- General
- Bucket Capacity
- 0.5~5m3
- Size
- General
- Certification
- CE, ISO9001: 2000
- Condition
- New
- Transport Package
- Film Covering + Pallet
- Specification
- Optional
- Trademark
- XIN FENG HUA
- Origin
- China
- HS Code
- 84314999
- Production Capacity
- 1000/Year
- Package Size
- 61.00cm * 1.00cm * 23.00cm
- Package Gross Weight
- 15.500kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of High Quality Track Link Track Shoe Assembly, R60 R55 R200 R210 R210LC R250 R300 R320 Track Link Assy
Find Similar Products
Product Description







I. Excavator Bucket Category1.The service life of the excavator bucket is far lower than expected. Which operations are most harmful to the bucket?
It is prohibited to use the bucket to drop and impact rocks (it is likely to cause deformation and cracking at the connection between the bucket and the boom arm); avoid prying objects with the back plate of the bucket (the lever principle makes the bucket teeth bear several times the pressure, resulting in fracture); do not use the slewing force to hit objects (it will damage the side plate, pin shaft and frame).
2.How to reduce the wear of the bucket during rock work?
Give priority to using the reinforced rock bucket (thickened plates and wear-resistant steel plates); when operating, keep the bucket fixed to the boom arm, and use backward dragging instead of vertical hitting; regularly check the wear of the bucket teeth, and replace the side teeth and skirt teeth in a timely manner.
II. Rotary Drilling Rig Bucket Category
1.How to select the rotary drilling rig bucket according to the geological conditions?
Soil layer/soft rock layer: Double-bottom sand-sucking bucket (suitable for silt, clay, and fully weathered rock);
Cobblestone/moderately weathered rock layer: Rock-embedded double-bottom sand-sucking bucket or double-layer cylinder drill (for compacting cobblestones);
Hard rock breaking: Joint construction of cylinder drill circular cutting + rock-embedded spiral drill bit.
2.How to prevent hole collapse during rotary drilling construction?
Keep the height of the mud liquid level stable (maintain the pressure on the hole wall); deal with it immediately when bubbles or slurry seepage occur around the casing; during the shutdown period, keep the drilling rig away from the soil-taking slope and park it on a solid flat ground.
3.How to predict the stuck drill rod or the drill rod being carried in advance?
Observe whether the main hoist depth gauge matches the position of the drill rod joint; monitor the rotation speed of the drill rod (the rotation speed decreases when the load is high); after lifting the drill rod, check whether the type of drill cuttings is consistent with the stratum.
III. Light and Small Hoisting and Handling Product Category
1.How to extend the service life of the handling equipment in the mining scenario?
Clean the hydraulic valve group every day to prevent dust jamming; select wear-resistant steel wire ropes; it is strictly prohibited to pull obliquely during hoisting (to avoid structural deformation caused by the shift of the center of gravity).
2.How to quantify the risks of overloading operations of mobile handling equipment?
Overloading by 10% can reduce the fatigue life of the steel structure by 50%; when pulling heavy objects obliquely, the lateral force borne by the track can reach twice the vertical load, which is likely to cause the track to deform.
IV. General Maintenance and Safety Category
1.How to prevent the cracking of the welded parts of the excavator bucket/drilling bucket?
Regularly check the welds of the bucket back plate and the hinge shaft; avoid overloaded prying operations; at the initial stage of cracking, use low-hydrogen electrodes for repair welding and reinforce the stress concentration points.
2.What are the risk points in the daily operation of light and small cranes?
The load shall not exceed the rated weight (the mobile gantry crane needs to balance the center of gravity); it is prohibited to pull heavy objects obliquely (it will cause the track to deform); regularly check the brake and limit switch of the electric hoist.
About the Supplier
This supplier has been audited by CTI. Verify the report on the official CTI website with ID "QIP-ASI257168". Items marked "" are certified.
Company Profile
As a professional manufacturer of engineering machinery components and material handling equipment, we are committed to providing one-stop solutions for global clients. Our product portfolio encompasses critical engineering machinery components including excavator buckets, bucket teeth, undercarriage parts, rotary drill buckets, and cutting picks, complemented by lightweight lifting and material handling equipment, comprehensively serving diversified demands in mining, infrastructure construction, and municipal engineering sectors.
Core Competencies:
Comprehensive Product Range: 2000+ product models with customization capabilities
Quality Assurance: ISO-certified quality management system with CE/RoHS compliance
Global Service Network: 24/7 multilingual customer support with technical consultation and after-sales services
Partnership Philosophy:
Since establishment, we have adhered to the principle of "Quality Foundation, Customer-Centric Approach, Integrity-Driven Collaboration". Through continuous technological innovation and supply chain optimization, we have successfully served clients in 50+ countries/regions. In this era of deepening globalization, we look forward to establishing long-term strategic partnerships worldwide, sharing opportunities in the engineering machinery industry, and jointly creating a sustainable business future.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 146 Jiedai Village, Huangtang, Quanzhou, Fujian, China
-
Plant Area
- 4692 square meters
-
Number of Employees
- 21
-
Registered Capital
- 1,000,000 RMB
-
Terms of Payment
- T/T
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: within 15 workdays, one month, 1-3 months
Off Season Lead Time: within 15 workdays, one month, 1-3 months -
Nearest Port
- Xiamen
-
Minimum Order Quantity
- 1
-
Supply Chain Partners
- 50
Our Production Capability & Technical Expertise
-
Main Products
- Excavator bucket, Drilling bucket, Excavator chassis parts, Hoisting and handling, Excavator attachments
-
Production Lines
- 2
-
Production Machines
- Radial drilling machine, Vertical milling machine, Lathe, Spot Welding Machine, Shot blasting machine, CNC Plate Cutting Machine
-
QA/QC inspectors
- 1 people
-
Inspection Type for Finished Products
- Random inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Finished product checked by packing staff
-
Customization Options
- Customization from Designs, Customization from Samples, Minor Customization, Full Customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 2 people
-
Traceability of Raw Materials
- Yes
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2021-03-11
-
Export Year
- 1 Year
-
Main Markets
- Australia, Domestic
-
Repeat Buyers Choice
- 30%~50%
-
Number of Foreign Trading Staff
- 2
-
Overseas Agent/Branch
- No
-
New Products Launched in Last year
- No
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO9001:2015, ISO14001, ISO45001:2018
-
Product Certification
- CE
-
Cooperated with Fortune 500
- Yes
Send your message to this supplier
People who viewed this also viewed
-
US$2,050.00 / Piece
-
US$2,050.00 / Piece
-
US$2,050.00 / Piece
-
US$32.00-36.00 / Piece
-
US$376.00-450.00 / Piece
-
US$2,050.00 / Piece
-
US$2,050.00 / Piece
-
US$35.00-1,300.00 / Piece
-
US$35.00-1,300.00 / Piece
-
US$14.00-18.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Excavator Parts Series
- High Quality Track Link Track Shoe Assembly, R60 R55 R200 R210 R210LC R250 R300 R320 Track Link Assy
Related Categories
Hot Searches
- Wheel Excavator Factories
- Track Machine Factories
- Chain Link Machine Factories
- Ce Excavator Factories
- Track Link Parts
- Track Link For Excavator
- Track Main Link
- Track Link Chains
- Undercarriage Track Link
- Excavator Track Link Bulkbuy